March 17, 2020

March 17, 2020

Please reload

Recent Posts

The Smeaton Building

March 17, 2020

1/10
Please reload

Featured Posts

Derriford High Temperature Hot Water Pressurisation Plant Replacement

November 23, 2017

Photo indicates the recent installation of the HTHW pressurisation plant in the hospital’s main plant room.

 

 

 

Share on Facebook
Share on Twitter
Please reload

Follow Us

I'm busy working on my blog posts. Watch this space!

Please reload

Search By Tags
Please reload

Archive
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
  • LinkedIn Social Icon
  • Twitter Social Icon
  • Google+ Social Icon