CASE STUDY

NEWTON ABBOT EXTRA CARE

Design and installation of the Building Services Systems for a 52 bed Extra Care Facility with communal areas.

Brothwell Irvine completed the M.E.P Design and Installation package within a 12 month Fast Track build program.

SERVICES PROVIDED:

  • Design and Build

  • Full M.E.P Installation

  • Sprinkler System

  • Warden Call and Access Control

Show More
  • LinkedIn Social Icon
  • Twitter Social Icon
  • Google+ Social Icon